Center Hill Dam Control Cable Replacement – Buffalo Valley, TN

Project Owner: USACE Nashville District
Cost: $3,305,683

The dam required extensive electrical infrastructure upgrades including removal of existing wire from conduit, cable trays and pull boxes.  Existing pull boxes and conduit between the transformer bank to the shop compound area required total replacement.  A new power supply was installed from the powerhouse station service board across to the Resource Manager’s Office and Shop Compound.  An existing 50-pair communication cable was removed and replaced with single mode fiber optic cables and termination equipment.